Zubair Oil field Development Project

Project Information

  • Cable Containment – More than 12 kms of electrical and instrumentation cable ladders, laid over PARS and sleepers
  • Earthing– More than 150 earthing pits and earthing rods, which has been installed and terminated with the earthing Grid, using CAD welding and crimping terminals
  • Power Distribution ( HV, LV, Control, Space heater, UPS) – More than 360 Kms of Power cables pulled over cable ladders and duct banks, including termination and final testing of all types of cables like Drum testing, HiPot testing, continuity and loop resistance testing
  • Instrumentation and Control– Pulling of 177 Kms of Control cables including termination and testing, between JBs and Field instruments from one side and LERSs and CCRs from the other side
  • Instrumentation Chemical injection and pneumatic tubing Installation of more than 3000 meters of chemical injection tubing and 1000 meter of pneumatic tubing
  • CCTV Cameras and cabling – Installation of more than 40 outdoor CCTV cameras on poles for Perimeter security
  • PAGA Speakers and cabling –  Installation of more than 175 outdoor/indoor speakers on poles and ceiling in two Loops A &B, including termination and system testing
  • ICSS Cabling – Pulling, termination, testing of More than 6 kms of 32,24 and 4 core Fiber Optic cable for ICSS networks and CCTV application
  • Field Instruments and JB Cabling- Installation of Field instruments  including more than 475 gauges, transmitters and manifolds, with the required supports, shades and labels
  • Fire and Gas System Installation – Installation of more than 300 Fire and gas detection equipment including call points, smoke detectors, IR detector, with the required support and labels
  • Street and Field Lighting:- Installation of more than 2100 lighting fixtures, including field lighting fixtures, poles and pipe racks fixtures and street flood lights (Single and Dual fixtures, over 12 meters Poles Height
  • Installation of ship loose items – For skids and substations
  • Client : ENI & Weatherford
  • Date : 2014-2017
  • Location : BASRA, IRAQ
  • Project Name : Zubair Oil field Development Project
  • Employees : 45