Dubai Metro-Phase 1

Project Information

Installation and Commissioning of Low Voltage Systems including the following systems (CCTV system, IAS system, TDS system, TN-ECB system PAS-PIS system) in Dubai Metro Red line.

Each system consisting of the following:

  • CCTV – installation of 650 CCTV cameras, splicing, installation and termination of FO/UTP cable in converter box, laying of 38,000 meters of 4 core fiber optic cable, laying of 32,200 meters of UTP CAT6 cable and laying of 38,000 meters of power cable
  • IAS – laying of 39,490 meters of power cable, UTP CAT6 cable, Belden cable and armoured copper pair cable
  • TDS – installation of 8 Sub master clock and 40 indoor digital clock, laying and termination of 3,200 meters of power cable and signal cable
  • TN-ECB – installation of 36 ECB and 233 BLS telephone on wall/pole, laying of 31,195 meters of COM cable
  • PAS-PIS – installation of 4,013 loudspeakers, 100 ambient noise sensor, 84 LCD displays, laying and termination of 71,583 meters of power cables and fiber optic cables
  • Fixing and Installation of 160 BBR access point boxes and related 3 meter pole structures including termination and 60 NBR poles including structure and 25 CCTV pole structures along wayside and stations in Dubai Metro Red line
Installation and Commissioning of Low Voltage Systems including the following systems(CCTV system, IAS system, TDS system, TN-ECB system PAS system, FON system) for both Jumeirah and Rashidiya carparks

Each system consisting of the following:

  • CCTV – installation of 998 outdoor IP cameras, 3,992 terminations of fiber at ODF, laying of 517,463 meters of fiber optic cable, SSTP Cat6 cable and power cable
  • IAS – installation of 57 Door control module, proximity card reader and laying of 23,095 meters of power cable, SSTP Cat6 ethernet cable and Belden cable
  • TDS – installation of 2 central master clock and digital clock, laying and termination of 100 meters GPS antenna cable, laying and termination of 333 meters of power cable TN-ECB – installation of 59 ECB, laying of 23,802 meters of twisted pair cable, termination of 67 telephone cables at socket
  • PAS – installation of 3,086 loudspeakers, 87 ambient noise sensors, laying and termination of 137,284 meters of power cables
  • FON – laying of 1,100 meters of 24 core fiber optic cable, and terminations of 96 fiber at ODF
  • Client : Thales, G4S
  • Date : 2009-2014
  • Location : Dubai
  • Project Name : Dubai Metro-Phase 1
  • Employees : 50 scaled to 400 during inauguration time 09.09.2009